09-11-17 Proof! Here’s the first truck of 10 carrying building #2 from Pennsylvania.

5 on Monday and 5 on Tuesday. Gotta get that building up quick. There’s snow in the forecast…
09-11-17 BIG DAY at Winnisquam Marine today! 27 cement trucks pouring building #2 floor and 5 truckloads of building #2.

And 5 more truckloads of building #2 tomorrow. Whew- that’s a big building !!
09-09-17 Floor setting overnight with the curing agent. Looking very good !! That’s half the floor done-

We’ll finish the rest on Monday…
09-08-17 Ryan inspecting the new floor progress for building #2.

And it’s looking very good…
09-08-17 Redimix Concrete pumping 270 yards of 4000psi concrete for half the floor. That’s 27 trucks of concrete!!!

At $104 a yard, that’s a lot of concrete…
09-02-17 The inside of building #1 is looking good. We’ll get the wood bunks installed next week !!

Actually it’s looking GREAT !!!!
09-02-17 All the 10 gauge welded wire is down. Just need concrete now…

New Tuesday. Stay away rain!
09-01-17 Now that’s a pond. Soon to be divided into 3 sedimentation pools. A really big pond.

Clean storm water will slowly be released back into the environment.
09-01-17 The divider between the 2 slabs with diamond inserts so the floor can move-

but yet stay at the same level without a ridge. This slab is too large to do as one pour. 220 feet by 109 feet !!!
09-01-17 All the 10 gauge wire is down for the concrete floor !!! 9 inch thick floor!!