07-30-17 Nutter construction has the rear wall excavation ready to pour. Looking very good, Nutter has moved on to building #2

The rear wall is 22o feet long. The building is 109 feet deep. Almost 45 feet tall. Should fit 250 boats in here, 4 levels tall…
07-29-17 Stop by and see “USED BOAT ALLEY” Located at Winni Landing!! 30+ Warrantied Used Boats

Which is located across the bay from our main showroom, on the Tilton side of the bridge.
07-28-17 The concrete is 100% ready for Building #1. 100% ready to go !!!! Bring it on !!!!

Ya, We’re ready !!!!
07-27-17 The SS Mini Winni is looking pretty good !!!!!

Thanks for the help Apple Tree Nursery. We just add water…
07-17-17 Another awesome sunrise over Lake Winnisquam. The weather has been picture perfect !!!!

See for yourself !!!!
07-20-17 Evan’s out there with his new Crownline 225SS, getting ready to wakeboard with the New England Boating Magazine crew.

And they had a great time….
Here’s one really nice looking Bennington Pontoon with a Mercury Verado 200.

Quiet, smooth and FAST !!!!
07-22-17 The first concrete pier has the form peeled off and now it’s curing awaiting Construx to start the building assembly !

So far – so good…
07-22-17 Mas-Con has poured all the footings and several of the piers for building #1. This building will hold 96 boats.

96 boats, 3 high in racks. Construx should be standing this building up sometime in the next 2 weeks !!!!
Nutter Construction is manufacturing structural fill for the new building platforms !!

They sort the fill, crush some rocks and pile the fill up ready for use.