08-12-17 Piers, pilaster and frost walls going up quickly !!!!

Building #2 is on it’s way….
Mas-Con is making GREAT progress on the foundation to building #2. AND the timing looks good !!!!

Once building #1 is up and looking good, Construx can move right onto building #2!
08-09-17 Construx arrives onsite to begin construction of building #1. YAYYYYYY !!!!

And the first building starts going up Monday 08-14-17.
08-07-17 A GREAT day to be pouring the footings for the boat rack piers !!

Cool and dry. It doesn’t get any better…
08-06-17 5:55am And then the sun rose and it was really nice out. Really, really nice out !!!

Hard to beat !!
08-05-17 BAYLINER- The Pot of Gold at the End of the Rainbow !!!!

Really!, See….
08-05-17 Anchor bolts set by Mas-Con. The center piers will be poured starting Monday. Construx to start erecting building #1 Monday!!

Actually mobilizing onto the site with their equipment and moving building #1 onto the site!
08-05-17 Most of the rear 220ft wall poured and the forms stripped.

Looking very good. Great progress.
08-04-17 Wild weather blew in about 6pm Friday. Lots of tree branches down and we got to test our generators for about 2 hours !!

Heavy, heavy downpour and high winds for about an hour.
08-01-17 8am Laying out the foundation for building #2. Mas-Con has 2 crews onsite and they are cranking out the concrete foundation.

Definitely cruising along now- these guys mean business !!!!