09-01-17 Now that’s a pond. Soon to be divided into 3 sedimentation pools. A really big pond.

Clean storm water will slowly be released back into the environment.
09-01-17 The divider between the 2 slabs with diamond inserts so the floor can move-

but yet stay at the same level without a ridge. This slab is too large to do as one pour. 220 feet by 109 feet !!!
09-01-17 All the 10 gauge wire is down for the concrete floor !!! 9 inch thick floor!!

9 inches thick where the fork truck travels. 6 inches thick under the racks.
08-25-17 Building #2 foundation is ready and waiting for building #2. The floor will be poured first 9/5+9/6.

Bring it on….
08-25-17 Ed’s taking good care of the 2017 Bennington QX/350hp Mercury Verado up on a pontoon boat lift for some lucky customer

Nice and dry up on the lift. Not even touching the water. Covered up every night. It doesn’t get any better…
08-25-17 The 230v and the low voltage 3 inch conduits are in the trenches !!! All set for electrical power and our 32 camera 4K resolution security cameras…

Looking good for all the powered systems…
08-25-17 Out for a late summer evening cruise on Lake Winnisquam !!!!

AND roughing it !!!!
08-25-17 Roofed!! Building #1 is roofed by Construx. Can’t wait for the side walls !!!!

Make your winter storage reservation and tell us, “you want to be in building #1”.
08-21-17 Monday 8am. The Construx crew is still killing it….

More rake trim. More Purlins. Roofing soon…
08-12-17 Matt, Gary, Evan and Mark at the Joe Mastrullo, Jr/Mallards Landing Memorial Scholarship golf tournament.

Gary, Evan and Mark winged it all day for a great cause. Good job guys…