08-05-17 Anchor bolts set by Mas-Con. The center piers will be poured starting Monday. Construx to start erecting building #1 Monday!!
Actually mobilizing onto the site with their equipment and moving building #1 onto the site!
08-05-17 Most of the rear 220ft wall poured and the forms stripped.
Looking very good. Great progress.
08-04-17 Wild weather blew in about 6pm Friday. Lots of tree branches down and we got to test our generators for about 2 hours !!
Heavy, heavy downpour and high winds for about an hour.