11-11-17 Zach is in charge of getting the racks set for all those boats. And he’s doing a GREAT job. Lot’s of room for all those triple logs!!!

And of course a lot of room for a squadron of fiberglass v-hulls too. The guys have been on it getting the racks prepped and cleaning up the construction site. It is looking good !!!!!!

Share the Post:

Related Posts

Search Our Inventory

  • Reset

Employment Application

This field is for validation purposes and should be left unchanged.

Your Personal Information

Name(Required)
Address(Required)
Email(Required)

Position You're Applying For

Position you're applying for:(Required)
If you were referred please list by who.
MM slash DD slash YYYY
Have you ever applied to this company before?

Education History

General Information

Do you have a valid Drivers' License?(Required)
Do you have an NH Safe Boating Certificate?(Required)
Do you have a DOT Card?(Required)
MM slash DD slash YYYY

Previous Employment

List Below Last Employers, Starting with the Last One First
Please List Latest 2 Employers (if applicable)
Employer Name
Address
Salary
Position
Reason for Leaving
 

References

Please List up to 3 References
Full Name
Address
Phone Number
Business
Years Known
 
Upload your resume in .pdf, .doc or .docx format
Drop files here or
Accepted file types: pdf, doc, docx, Max. file size: 25 MB.